Simply Blue Energy

Location

The map above shows approximate locations for the project’s infrastructure. The REP will be located in Goldboro and a transmission line will connect the facility to both our solar and wind farms in the district of Saint Mary’s.

We are in the very early stages of project development. To limit the impact to the environment and community, the team are conducting detailed studies to determine the exact number and location of the wind turbines and are also investigating various routing options for the transmission line. Following further studies and consultation with stakeholders, possible locations and routes will be identified.

As soon as this information becomes available, you will be informed.

Project Timeline

Construction is expected to commence in 2026 after all required permits have been obtained, and the project is expected to be operational in 2029.